Energy Master Plan
An Energy Master Plan was completed by DCSix Technologies in 2021.
Energy Baseline
The Total Energy Demand (TED) of the community in 2019 was estimated to be 10,373 MWh, €922,573 and 2,845 tonnes of CO2.
The breakdown of each is shown below.